Analysis Shape and Development Time of Dam Breach at Jatibarang Dam.pdf
Abdul Kholik Romarchan, - and Togani Cahyadi Upomo, - and Rini Kusumawardani , - and Yeri Sutopo , FT Teknik Sipil Analysis Shape and Development Time of Dam Breach at Jatibarang Dam.pdf. In: 1st International Conference on SUSTAINABLE INFRASTRUCTURE AND ENGINEERING 2017, 10 Oktober 2017, Kuala Lumpur .
![]() Preview |
PDF
Download (19MB) | Preview |
![]() Preview |
PDF ( Analysis Shape and Development Time of Dam Breach at Jatibarang Dam.pdf)
- Published Version
Download (476kB) | Preview |
![]() Preview |
PDF
Download (7MB) | Preview |
Abstract
Dams have many benefits, however dams can cause big problems. One of the problem is dam failure. Dam failure can cause loss of lives and materials. For example, the 1963 failure of Vajont dam in Italy caused 2600 deaths, the 1976 failure of Teton dam in America caused hundred deaths and economic loss about 1 bilion dollars, and the 1993 failure of Gouhou dam in China caused 300 deaths. Government of Indonesia have regulations about damsafety, which one each dam must have the document “Rencana Tindak Darurat” (RTD) in order to anticipate loss of lives and material. This study was conducted to know the shape (wide and slope) and time development of the dam breach. Therefore the dam break analysis could be performed for purpose to fit up the document “Rencana Tindak Darurat”. The method of this study was Froehlich (1995 & 2008), MacDonald and Langridge-Monopolis (1984), Von Thun and Gillete (1990), Xu and Zhang (2009).
Item Type: | Conference or Workshop Item (Paper) |
---|---|
Uncontrolled Keywords: | Dam, Dam breach, Dam failure |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) |
Fakultas: | Pasca Sarjana > Pendidikan Kejuruan, S2 |
Depositing User: | mahargjo hapsoro adi |
Date Deposited: | 11 Jun 2020 17:51 |
Last Modified: | 16 Jun 2020 13:22 |
URI: | http://lib.unnes.ac.id/id/eprint/36743 |
Actions (login required)
![]() |
View Item |